Well, the end of the
semester is here. Where did the time go!? I have been unbelievably busy with
work from all of my classes. I have been working on chapter 3 within my thesis.
Recently. Within this chapter, we discuss methodology, site analysis, and
provide a building program for the proposed structure. So I thought this would
be the perfect topic to discuss in today’s blog!
The methodology
incorporated into this thesis will review case studies, simulation, &
experimental methods. Successful design elements taken from previously reviewed
case studies will be incorporated into the design of this hurricane resistant
mixed-use structure. Simulation will occur as I begin to develop the structure
within the BIM program Revit. Experimental methods will be a very important
part of this project because, after all, this building is supposed to be
hurricane resistant. After the structure is designed, a series of high speed
wind tests will be conducted on the structure, testing its limits.
There
will be 3 categories of building found within the mixed-use building. The 1st
& 2nd level will contain retail space with a food court. Parking
for the residents within the tower will be found on the 3rd-5th
floors, with 1 & 2 bedroom residential apartments above.
#
|
Space
|
Size
(SF)
|
Qty
|
Total SF
|
Notes
|
1
|
Retail Space
Storage
|
2400
800
|
12
12
|
28,800
9,600
|
Located on 1st & 2nd Floor
|
2
|
Food
Kitchen
Food Service Area
Sitting Area
|
600
200
2,500
|
4
4
1
|
2,400
800
2,500
|
Small
Food Court
|
3
|
Mechanical
|
141,289
|
2
|
282,579
|
|
4
|
Apartments
1 Bedroom
2 Bedroom
|
1,400
2,300
|
75
200
|
105,000
460,000
|
Passive
Heating / Cooling
|
5
|
Parking
|
300
|
200
|
60,000
|
3rd – 5th Floor
|
6
|
Shipping & Receiving
Loading Dock
Receiving
|
500
2,000
|
1
1
|
500
2,000
|
|
8
|
Building Storage
|
400
|
4
|
1,600
|
|
9
|
Janitors Closet
|
100
|
4
|
400
|
|
10
|
Elevators
Passenger Elevator
Freight Elevator
|
150
100
|
4
1
|
600
100
|
|
11
|
Public Toilet Rooms
|
300
|
4
|
1,200
|
|
13
|
Workout Room
|
800
|
1
|
800
|
|
14
|
Pool/ Spa Area
|
3,000
|
1
|
3,300
|
|
15
|
Entry Vestibule
|
200
|
2
|
400
|
|
16
|
Lobby
|
1,000
|
1
|
1,000
|
High
Ceilings. Natural Light
|
17
|
Administration
Managers Office
Reception / Waiting
Employee Workstation
Filing / Storage
Toilet Room
|
300
400
80
100
90
|
1
1
8
1
1
|
300
600
640
100
90
|
With View
With View
Unisex
|
Program
Square Footage: 1,224,509 Square Feet
Circulation:
30% of 1,224,509 = 367,352 Square Feet
Total
Building Square Footage: 1,591,861 Square Feet