Hey
welcome back and happy early Halloween! I am so excited to be down at southern
for Halloween, I bet it is going to be a blast, though I have no clue what I
want to be and it’s only two days away. Since we last talked I feel like only
minor changes have happened.
My
master-planning group is pretty developed I really have a great group that has
really worked hard. I will refresh your memory and explain the project once
again. We are looking at the site for the 2016 Olympics in Rio de Janiero and
taking part of AECOM’s “legacy” plan and redeveloping it. Then from there we
choose to design either residential or hotel. Image 1 is a diagram of our
master plan from midterm two weeks ago. The brown residential area on the right
side of the diagram is the area that I will be designing. I changed the plan
since then I will now have eight buildings instead of nine and there are two
different size buildings. I am breaking my buildings into four groups of
buildings, which will be connected in the middle with a stairway that will
reach each floor. Each connection will include one big building and one small.
All of the smaller buildings are four stories and consist of 3 apartments per
floor except for the first story that will have parking for itself and it’s
connected building. Where as the bigger building are three stories with four
apartments on each floor. When I have my plans a little further developed I
will share them with you.
As
for all my other classes they have been going well, we have been developing our
structure for the eight residential structures in studio. My thesis has not changed much, we just
started working on our chapter three which is the program analysis. I can tell
you that I am so excited to work on my thesis. When I was in undergrad the idea
of a thesis was so terrifying but now that I am so close to it I cannot wait
for it to come!
Thanks
for reading, see you in November!
No comments:
Post a Comment